- Joined
- Jun 23, 2025
- Messages
- 17
- Thread Author
- #1
Industrial Inspection Schedule
In accordance with the Industrial Regulation Act (IRA), this post serves as notice for all upcoming industrial inspections.Per the enactment clause of the IRA, all listed inspections will take place within the next 6 days.
The table below contains all currently scheduled inspections and their assigned dates.
Property ID | Owner | Date | Inspector |
| i001 | ocg | 6/12-6/15 | LOA |
| i002 | @StuffTheTurkey0 | 6/12-6/15 | Dayvon cookie |
| i003 | @Cofys | 6/12-6/15 | Dayvon cookie |
| i004 | @Westray | 6/12-6/15 | Dayvon cookie |
| i005 | @xXLordLyonXx | 6/12-6/15 | Dayvon cookie |
| i006 | RDS | 6/12-6/15 | Dayvon cookie |
| i007 | CityRPGov | 6/12-6/15 | Exempt |
| i008 | @DeathFired | 6/12-6/15 | Dayvon cookie |
| i009 | @W4RP4TH | 6/12-6/15 | Dayvon cookie |
| i010 | @Methedex | 6/12-6/15 | w4rp4th |
| i011 | Galavance | 6/12-6/15 | LOA |
| i012 | Galavance | 6/12-6/15 | LOA |
| i013 | Galavance | 6/12-6/15 | LOA |
| i014 | Galavance | 6/12-6/15 | LOA |
| i015 | @Matty707 | 6/12-6/15 | w4rp4th |
| i016 | Matty707 | 6/12-6/15 | w4rp4th |
| i017 | Matty707 | 6/12-6/15 | w4rp4th |
| i018 | Matty707 | 6/12-6/15 | w4rp4th |
| i019 | RDS | 6/12-6/15 | w4rp4th |
| i020 | @UsernameDude100 | 6/12-6/15 | w4rp4th |
| i021 | @jotoho | 6/12-6/15 | w4rp4th |
| i022 | @LilDigiVert | 6/12-6/15 | w4rp4th |
| i023 | Galavance | 6/12-6/15 | LOA |
| i024 | @Nopuu | 6/12-6/15 | Biscuit cookie |
| i025 | @nanicholls | 6/12-6/15 | Biscuit cookie |
| i026 | @BiscuitPlaysYT | 6/12-6/15 | Dayvon Cookie |
| i027 | UsernameDude100 | 6/12-6/15 | Biscuit cookie |
| i028 | @Luke201556 | 6/12-6/15 | Biscuit cookie |
| i029 | @Joryjman | 6/12-6/15 | Biscuit cookie |
| i030 | LilDigiVert | 6/12-6/15 | Biscuit cookie |
| i031 | @saggwizard13 | 6/12-6/15 | Biscuit cookie |
Notes
If you need a different inspection date, let us know and we'll try to work something out.Since this is the first round of inspections, make sure every grid on your property has a public Production Monitor and Power Pylon available for inspectors to use. They can be inside a room, behind a wall, or anywhere else on the property, but they must be public.
To make them public, look at the block and run:
/mt public true
This allows inspectors to access the data needed for the inspection.
If you do not have the required public monitor and pylon, you may receive a Failure to Monitor fine.
If you have tenants, you are responsible for them.
Sorry for the late time of inspections due to other stuff at mud , and yes i am the deputy minister now and i am incharge of this !!!!
Failure to Monitor
This offense occurs when a property does not have a public Production Monitor and public Power Pylon available on every grid for inspectors to access during an inspection.It is highly recommended that you either leave the property reasonably accessible or provide instructions for entry. You may also be present during the inspection and provide access yourself.
You may refuse entry to your property. However, refusal of entry will result in an automatic failed inspection under the IRA.
Inspectors are permitted to enter a property during an inspection. If entry is refused, the inspection automatically fails.
You are not required to respond to this post. However, if you do not grant permission to enter and access is needed, the inspection may fail.
Inspectors are never required to physically enter a property. In many cases, they can complete the inspection from public land if they can access the Production Monitor and Power Pylon.
You are welcome to perform your own mock inspection beforehand to see how your property scores.
Please Reply With The Following Information
Do not include the questions. Only post your answers.- Will you or a trusted person be present during the inspection?`
- Do you give the inspector permission to enter the property?
- Do you need to reschedule? If so, what date(s) work for you? (4/21/2026 - 4/27/2026)
- Do you grant permission for inspectors to enter the property? If you do not answer this, entry is not permitted and the inspection may fail.
- Any special entry instructions or notes on where the Production Monitor and Power Pylon are located?
Example Reply
- Yes
- Yes
- 6/12/2026 at 5:00 PM
- Yes, with limitations.
- Use the staff entrance. The inspector has been added to /trust. The Production Monitor and Power Pylon are located next to the entrance. The dates available are 6/12 - 6/15
Last edited: