Welcome!

By registering with us, you'll be able to discuss, share and private message with other members of CityRP.

SignUp Now!

Methedex

Member
Parliament Speaker
Methedex
Methedex
Citizen
Joined
Sep 14, 2024
Messages
122
Inspection Report

Property:
i031
Date: 4/24/2026
Owner: Saggwizard
Inspector: Methedex
Current Crimes
None
Total Score:
0
Power Source Score: 0
Power Efficiency Score: 0
Pollution Score: 0

Result: FAILED

Offenses Committed
- Failed Inspection 1st Offense
- Failure to Monitor1st Offense

Notes: Saggwizard had a unofficial lawyer handle the inspection, they did not deny entry to the property but the lawyer told me they did not consent to a warrantless search despite and inspection not being a search. This resulted in me doing the inspection from public property as is my right according to the IRA. No monitor was accessible nor was a production monitor. So the inspection failed as i could not reach one at the edge of the property boundary from public property. Its worth noting I help saggwizard do a mock inspection and they would have passed the inspection, and they had no issue with the inspection be done originally. It is my personal belief the owner has been told false information that is making them prevent the inspection. As the lawyer is actively spreading misinformation about the IRA causing confusion for a otherwise mundane task.

This report is not completed nor is its final determination complete until signed off by the MUD minister by leaving a comment below indicated it is complete.
Inspection Scoring Details
 
In accordance with the IRA, the property is scheduled for a follow-up inspection. The next inspection is scheduled in for 4/27/2026
3.a.ii If a property fails inspection, a follow-up inspection must be scheduled within 3–7 days.
 
Back
Top