Industrial Inspection Schedule

In accordance with the Industrial Regulation Act (IRA), this post serves as notice for all upcoming industrial inspections.
Per the enactment clause of the IRA, all listed inspections will take place within the next 6 days.
The table below contains all currently scheduled inspections and their assigned dates.

Property ID
Owner
Date
Inspector
i001ocg 6/12-6/15LOA
i002@StuffTheTurkey0 6/12-6/15Dayvon cookie
i003@Cofys 6/12-6/15Dayvon cookie
i004@Westray 6/12-6/15Dayvon cookie
i005@xXLordLyonXx 6/12-6/15Dayvon cookie
i006RDS6/12-6/15Dayvon cookie
i007CityRPGov6/12-6/15Exempt
i008@DeathFired 6/12-6/15Dayvon cookie
i009@W4RP4TH 6/12-6/15Dayvon cookie
i010@Methedex 6/12-6/15 w4rp4th
i011Galavance6/12-6/15LOA
i012Galavance6/12-6/15LOA
i013Galavance6/12-6/15LOA
i014Galavance6/12-6/15LOA
i015@Matty707 6/12-6/15 w4rp4th
i016Matty7076/12-6/15 w4rp4th
i017Matty7076/12-6/15 w4rp4th
i018Matty7076/12-6/15 w4rp4th
i019RDS6/12-6/15 w4rp4th
i020@UsernameDude100 6/12-6/15 w4rp4th
i021@jotoho 6/12-6/15 w4rp4th
i022@LilDigiVert 6/12-6/15 w4rp4th
i023Galavance6/12-6/15LOA
i024@Nopuu 6/12-6/15Biscuit cookie
i025@nanicholls 6/12-6/15Biscuit cookie
i026@BiscuitPlaysYT 6/12-6/15Dayvon Cookie
i027UsernameDude1006/12-6/15Biscuit cookie
i028@Luke201556 6/12-6/15Biscuit cookie
i029@Joryjman 6/12-6/15Biscuit cookie
i030LilDigiVert6/12-6/15Biscuit cookie
i031@saggwizard13 6/12-6/15Biscuit cookie

Notes

If you need a different inspection date, let us know and we'll try to work something out.
Since this is the first round of inspections, make sure every grid on your property has a public Production Monitor and Power Pylon available for inspectors to use. They can be inside a room, behind a wall, or anywhere else on the property, but they must be public.
To make them public, look at the block and run:

/mt public true
This allows inspectors to access the data needed for the inspection.
If you do not have the required public monitor and pylon, you may receive a Failure to Monitor fine.
If you have tenants, you are responsible for them.
Sorry for the late time of inspections due to other stuff at mud , and yes i am the deputy minister now and i am incharge of this !!!!

Failure to Monitor

This offense occurs when a property does not have a public Production Monitor and public Power Pylon available on every grid for inspectors to access during an inspection.
It is highly recommended that you either leave the property reasonably accessible or provide instructions for entry. You may also be present during the inspection and provide access yourself.
You may refuse entry to your property. However, refusal of entry will result in an automatic failed inspection under the IRA.
Inspectors are permitted to enter a property during an inspection. If entry is refused, the inspection automatically fails.
You are not required to respond to this post. However, if you do not grant permission to enter and access is needed, the inspection may fail.
Inspectors are never required to physically enter a property. In many cases, they can complete the inspection from public land if they can access the Production Monitor and Power Pylon.
You are welcome to perform your own mock inspection beforehand to see how your property scores.

Please Reply With The Following Information

Do not include the questions. Only post your answers.
  1. Will you or a trusted person be present during the inspection?`
  2. Do you give the inspector permission to enter the property?
  3. Do you need to reschedule? If so, what date(s) work for you? (4/21/2026 - 4/27/2026)
  4. Do you grant permission for inspectors to enter the property? If you do not answer this, entry is not permitted and the inspection may fail.
  5. Any special entry instructions or notes on where the Production Monitor and Power Pylon are located?

Example Reply

  1. Yes
  2. Yes
  3. 6/12/2026 at 5:00 PM
  4. Yes, with limitations.
  5. Use the staff entrance. The inspector has been added to /trust. The Production Monitor and Power Pylon are located next to the entrance. The dates available are 6/12 - 6/15
 
Last edited:
1. Yes.
2. Yes.
3. No.
4. Yes

If im not on you can just enter the property. I will have the power pylon and production monitor clearly marked. I will likely also have a Utility Room containing all of the Power Breakers etc. (Will be marked if present)
 
  1. No
  2. Yes
  3. No
  4. Yes
  5. Currently no power grid on plot - feel free to check.
 
I026 (Owner)
No
Yes
Yes I can perm siege for entry to i026_rental_1
Both are above the door to i026_rental_1 shares a grid with i020

I020 (Rent to Own)
I won’t be present (Tenant)
Yes
6/12/2026 at 5:00 PM
I mean it’s a giant hole with only a few wind turbines on it so I don’t see the need for you to enter
The public pylon and monitor are in front however this plot shares a power grid with i026
 
Back
Top