Material | Quantity |
|---|---|
| Smooth Stone Slab | 452 |
| Stone Slab | 410 |
| Packed Mud | 367 |
| Diorite Wall | 363 |
| Granite Stairs | 348 |
| Brick Wall | 345 |
| Sandstone Stairs | 320 |
| Brick Stairs | 266 |
| Brick Stairs | 264 |
| Tuff Wall | 261 |
| White Concrete | 244 |
| Sandstone Slab | 240 |
| Smooth Stone | 226 |
| Coarse Dirt | 222 |
| Red Glazed Terracotta | 184 |
| Chiseled Sandstone | 184 |
| Cobbled Deepslate Wall | 166 |
| Cobbled Deepslate Slab | 154 |
| Block of Quartz | 146 |
| Nether Brick Fence | 120 |
| Ladder | 132 |
| Polished Granite Slab | 107 |
| Polished Deepslate Wall | 96 |
| Polished Diorite Stairs | 96 |
| Stone Stairs | 92 |
| Polished Deepslate Slab | 90 |
| Chiseled Tuff | 87 |
| Green Terracotta | 84 |
| Mud Brick Wall | 83 |
| Polished Granite Stairs | 80 |
| Smooth Sandstone Stairs | 70 |
| Mud Brick Stairs | 66 |
| Brick Slab | 59 |
| Tuff Bricks | 55 |
| Mud Bricks | 49 |
| Polished Deepslate Stairs | 32 |
| Chiseled Tuff Bricks | 30 |
| Green Concrete | 28 |
| Cut Sandstone Slab | 26 |
| Brown Terracotta | 23 |
| Smooth Sandstone Slab | 22 |
| Andesite Wall | 19 |
| Prismarine Wall | 18 |
| Polished Deepslate | 16 |
| Stone Brick Stairs | 13 |
| Mud Brick Slab | 12 |
| Blackstone | 9 |
| Block of Raw Gold | 8 |
| Smooth Red Sandstone | 8 |
| Smooth Red Sandstone Stairs | 8 |
| Quartz Stairs | 4 |
| Anvil | 2 |
| Stone Brick Wall | 2 |
Tender Terms
- Starting Bid: $3.362,69
- Bidding Opens: Immediately.
- Bidding Closes: 2026-11-21 21:20 UTC, or 24 hours after the last bid (if at least one bid has been received), whichever comes later.
- Delivery Deadline: Within 72 hours of confirmation of the winning bid.
- Delivery Location: MUD Warehouse (mud-warehouse), drop off room #4A.
- Minimum Bid Reduction: $100.00.
- Payment: Within 5 days (120 hours) following successful delivery.
- The Minister of Economic Affairs shall serve as the final arbiter in any dispute regarding the selection of the successful bidder.
- Failure to deliver the contracted materials by the required deadline will result in forfeiture of the award. In such cases, the Ministry of Economic Affairs may, at its sole discretion, accept the next lowest valid bid or cancel the tender entirely.
- For each participating individual or legal entity, only their last bid submitted before the closing of the bidding period counts.